Independent firestop inspection and passive fire protection expertise for the life of the building.

PFS inspects, surveys, documents and helps you manage the firestop systems and fire-resistive joint systems that keep a fire where it started. Independent of every installer, manufacturer and supplier. Based in Calgary, Alberta.

What we work to

ASTM E2174

The standard inspection methodology we apply for the on-site field verification of installed penetration firestop systems.

ASTM E2393

The standard inspection methodology we apply for the on-site field verification of installed fire-resistive joint systems and perimeter fire barriers.

ISO/IEC 17020 Type A

The international standard for bodies performing inspection; Type A is the independent third-party category. Our quality management system operates on this model to protect technical objectivity and commercial independence.

IAS AC291

The accreditation criteria for Special Inspection Agencies. Our inspection procedures, documentation and quality controls are built to align with these criteria.

PFS Passive Fire Solutions Inc. is an independent inspection and advisory firm. We do not practise professional engineering, perform laboratory testing, or issue engineering judgements.

Services

Five services. One question behind all of them.

Does the passive fire protection in this building do what the drawings, the listings and the code say it does — and can you prove it?

01

Building Survey & Firestop Inventory

What exists, where, and what condition it appears to be in — penetrations and joints located, photographed, and recorded as observed, against a listed system where one can be identified and as unidentified where it cannot.

How it works →
02

Digital Firestop Asset & Maintenance Program

The inventory becomes a living digital record, reviewed on an agreed cycle, with an annual status summary the owner can plan against.

How it works →
03

Field Verification — ASTM E2174 / E2393

Independent third-party inspection of installed firestop and joint systems during construction. Deficiencies advised to the installer within one working day; every inspection form issued to the authorizing authority and the installer within one working day.

How it works →
04

Closeout Documentation Review

A review of the contractor's firestop turnover package for completeness and consistency — what is there, what is missing, and what that means.

How it works →
05

Advisory & Contractor Support

Specification review under Section 07 84 00 for owners and design teams; non-project-specific QA/QC systems, documentation and training for contractors.

How it works →
Not sure?

Describe the building

Tell us the building, the stage it is at and what you need the record for. We will say which service fits, which does not, and why — before a proposal.

Contact PFS →
The record is a code requirement

Firestopping has to be right on the day of occupancy — and stay right.

The National Building Code of Canada requires penetrations of a fire separation, and the joints that keep a fire separation continuous, to be sealed by a firestop tested to CAN/ULC-S115 with the required F or FT rating (NBC 2020 Articles 3.1.9.1 and 3.1.8.3). That is the standard an installation is inspected against during construction.

Once the building is occupied, the National Fire Code of Canada takes over. Where fire separations are damaged so as to affect their integrity they must be repaired, and where materials used to provide fire protection are damaged or removed they must be repaired or replaced so that the integrity of the fire separation is maintained (NFC 2020 Division B, Article 2.2.1.2). The Code also requires records of the tests and corrective measures it calls for to be retained for examination by the authority having jurisdiction (NFC 2020 Division C, Article 2.2.1.2). Alberta applies both codes through the National Building Code and National Fire Code – 2023 Alberta Editions.

What that means for an owner

An inventory that says what firestop systems exist and what they were installed to, a record of what was reviewed and when, and evidence of what was repaired, is what those articles ask for in practice. It is also the difference between a fire separation that can be maintained and one that can only be guessed at. Every PFS service produces or keeps that record.

Independence

We don't install it. We don't sell it. We don't design it.

That is the whole point. PFS operates on the ISO/IEC 17020 Type A model: no ownership, employment or financial interest in any firestop installer, manufacturer or supplier, and no inspection of anything we advised on. Every engagement is screened for conflicts before a proposal is issued, and the answer to a client who would like a finding softened is no.

Our quality system is documented against the IAS AC291 Accreditation Criteria for Special Inspection Agencies — an ISO/IEC 17020 scheme — with the intention of applying for accreditation. PFS is not currently an accredited Special Inspection Agency, and we say so on every document we issue.

  • Deficiencies advised to the installer within one working day. ASTM E2393 requires it. ASTM E2174 requires the notice period to be agreed before installation begins; PFS's is one working day.
  • Every inspection form issued within one working day after an area is inspected, to the authorizing authority and the installer — both practices require it.
  • Inspection of completed work, and re-inspection after repair, within two working days of the installer's notice.
  • No fee ever linked to a finding. Not a discount for a clean result, not a holdback for an acceptable one.
  • Records kept for ten years from the final deliverable, so the evidence exists when it is needed.
Who we work with

Owners, managers, design teams, contractors and authorities.

Building owners and facility managersKnow what you have, what condition it is in, and what to budget — and keep it that way through the life of the building.
Architects, engineers and consultantsIndependent field records you can rely on, issued on time, in the form the practices require.
General contractors and firestop installersClear, early notice of what needs fixing, and a closeout package that is complete the first time.
About

Twenty years on the installing side. Now on yours.

PFS was founded by Corey Beckett after close to two decades in firestopping — estimating, project management, tested-system selection, quality assurance and closeout — most recently as a firestop division manager and the Designated Responsible Individual for a UL Qualified Firestop Contractor program. He has passed the UL Firestop Exam and is active in the Firestop Contractors International Association, in its committees and in code and specification development.

That background is why PFS knows what a deficient installation looks like, what a defensible one looks like, and how to tell a contractor the difference without wasting anyone's day.

More about PFS

Passive fire protection doesn't end at turnover.

Firestop systems get penetrated by later trades, damaged during renovations and forgotten during tenant fit-outs. A building that was right on the day of occupancy is often wrong five years later. PFS exists to document, maintain and manage rated assemblies through the life of the building — not just to inspect them once.

Have a project, a building, or a question?

Tell us what you need. We will tell you plainly whether we are the right firm for it.

Contact PFS